I'd say, prepare for the worst, if it doesn't go that way, all the better. You need to seriously walk through it all. When we moved last winter, we lost about 5 days of production, if you want to use that as some kind of indicator. That was: moving a 10 color auto, and a small 24" x 12' dryer, a manual, and having a new gas dryer installed. I'd say the press was a 3 day job between the tech dismantling, getting it moved, and put back together and tested to be sure it was right. In the end, it will take what it takes, no matter what your plans.
Steve