Opportunity is missed by most people because it is dressed in overalls and looks like work. - Thomas Edison
Hey Everyone, First time poster, but I have definitely been lurking and learning a lot of information from the tremendous amount of knowledge throughout this forum.I run a very small shop and feel that I take and spend too much time getting my registration completed. A 3 color job may take about 10-15 minutes, while a 6 color may take all of 25-40 minutes ( taping to production time). Being self taught and never having the opportunity to work in a shop, standard practices have been learned from youtube and forums. Are they any registration systems out that will work with the Anatol Volt ? Maybe something similar to the M&R tri loc or Roq's system. Thanks for any advice and input you can lend. What style pallets (slide or clip ins), what size screens?KevinINKed Signs and Apparelinkedsigns.comhttps://www.instagram.com/inked_signs_apparel/
kevin, it was great to speak with you about speeding up registration - stay in touch and glad you're enjoying your Anatol VoltMichael JirasekAnatol...mj@anatol.com847-582-1694
I think if you have the slide style pallets the triloc will fit on the volt. You can also get a vastex VRS sized for the press as well.
Quote from: Nation03 on April 28, 2017, 08:59:01 PMI think if you have the slide style pallets the triloc will fit on the volt. You can also get a vastex VRS sized for the press as well.I'll probably end up going with this. $1800 is hard to swallow but when I think of the time I'll save should he worth it. Took me an hour to dial in the last color on a 3 color job. Albeit, it was my first time using the micro system and I didn't have any prepress system in place. Felt stupid. Sent from my iPhone using Tapatalk