Like Sonny said, on our DB, we either remove a pallet for extra room, or just put the pallets in half index position, tilt the frame on it's side, having the right side screen clamp unlocked and move all the way to the out position, you can slide your frame up, tilt it level, then slide your right side clamp back into place and lock it down. On the DB, especially when change over for jobs is going on and some heads might be using the same colors and you want to leave the squeegee and flood bars in place, this makes it the fastest way. We've tried the pull the screen to the front position with a squeegee and flood bard in place but it won't drop out, maybe newer models are different with a notch like some other side clamp presses, but for us the tilt in method works fastest.