"He who marches out of step hears another drum." ~ Ken Kesey
Here are a couple pics as requested. Just finished 600 shirts front and back and here are a couple things now on our to do list:1. Change out the single wall ducting for double wall because that stuff gets HHHOOOTTTT!!!2. We may need to tighten up where the chambers connect because we were getting what appears to be some heat escape though it stopped later into the run so maybe this can be attributed to "break-in time" and was not actually heat escape. We will keep an eye on this.3. Run a line from the rotary screw compressor because the automatic tracking (which requires air that we were not aware of when we added this optional feature) kicked on our pancake compressor enough to drive us nuts since it was three feet from us.4. Throw that shirt on the drier as sloppy as you want because the days of folding the shirt to the size of the design to increase throughput are over!