M&R two slot sq holder w/ metal dowel rod. How to load?
We just got in a new set of 75/90/75 squeegees, winged flood bars and holders.
Our others are held with bolts and nuts.
Is there a trick/process to loading the blades into these and locking them in? When you load a blade in place, the back end is too tight to fit a rod...if you load the rod first, then the top is too tight to load the blade.
I tried just setting the rod at the tip of one side and starting the blade in at the other, but was a tad difficult with nobody else here at the time to hold in place. Still, I doubt this is the method. I'm sure it's something obvious I'm overlooking.