Yeah, this is Danny's old unit.
M&R gave us an amazing deal on it (Thanks Rich & Alex!) so even if we put work into it we should still be looking good.
We're seriously a tiny shop, but I feel we are to slow even with the auto. Our average job size has dropped from 100-200 to 50-100. So we need to be able to set up and produce screens faster. We are embarrassingly slow on set up. So I'm thinking just in pre-reg time savings we should be able to sneak in a couple extra jobs/week. And if we can start popping the screens in and go this will be the greatest thing to ever happen to us
I'll keep everyone posted how we make out. If a shop as small as ours ends up benefiting, than I think a lot more people will have to look at getting one.