"He who marches out of step hears another drum." ~ Ken Kesey
Next to the coating room we have a 8'x8' room with a pocket door, small 1500w space heater and dehumidifier...we can fit 4 full racks of 24ea 23x31 frames, they dry after reclaim in about 45 minutes. 20-25 minutes if we double-space them in the rack. Same time frame to dry after coat...at roughly 100f degrees...give or take 10 degrees depending on volume. As soon as the screens are washed they live in racks until the get masked...a drying cabinet would be such a hindrance to load and unloads two hundred times a day.But, we had the room and had to come up with a solution for our volume. If we had lower volume a small drying rack looks like a killer idea...especially if the drying room was replaced with a pass-through drying rack right next to the CTS, which we've considered doing...but the load/unload process happens enough as it is after being washed and de-stenciled.
I actually bought the one from him on wednesday before we all went to MindsEye... It arrived on Monday...being able to have ready to go screens an hour or so after coating is awesome, and NOT bringing the humidity up in the screen room is really nice too.